Leading Travel Provider - Foreign Exchange Ordering

Black Pepper developed a system to manage foreign currency orders (travellers cheques, currency, money orders etc) for a leading travel provider. Adobe flex was used for the user interface, with web services providing business functionality.

The core system was developed and then deployed in three months, which was unprecedented in the organisation. An iterative, agile approach ensured the business was in control of the project throughout, and that the system was developed at the lowest possible cost. Black Pepper were able to arrange site hosting and implemented security, failover and disaster recovery practices.

This site uses cookies. Continue to use the site as normal if you are happy with this, or read more about cookies and how to manage them.

×